Mill Cove Sewage Treatment Plant
Bedford, N.S.
The Halifax metropolitan area has seen an extensive
population expansion in the last 30 years. Bedford has seen some
of the fastest growth, and as a result, the existing sewage treatment
plant was not adequate for the increased demands. BMR carried
out the structural design required to increase the plant capacity
from 5 million gallons of effluent per day to 7.5 million gallons
per day. To meet future demands, the design allows for expansion
to 10 million gallons per day.
Design and construction of many of these components
was complex due to the proximity of existing structures and the
requirement that the plant be kept in operation throughout the
expansion process.
more>>
|